I did some of this work in parallel w/3" AT gun & track. Step one photos got lost. Step one was boring clean-up, scraping, carving, adding tow hook, window glazing, initial priming & paint and fitting a driver to the seat.
Step 2 is test fitting wheels/axles & assembling the interior to the cab. Both trucks are being worked together.
View attachment 308990
Step 3 working axle positions to allow some flexibility.
View attachment 308991
Step 4 install wheel/axle assys., drill holes and install splines for a better connection between sub assys.
View attachment 308997
Step 5 drill holes for ROCO side view mirrors, install grills & front bumper/winch assys. Assemble sub assemblies.
View attachment 308999
352s almost done-starting clean-up on 105s & gathering details for same.
View attachment 309000
PaulE
Step 2 is test fitting wheels/axles & assembling the interior to the cab. Both trucks are being worked together.
View attachment 308990
Step 3 working axle positions to allow some flexibility.
View attachment 308991
Step 4 install wheel/axle assys., drill holes and install splines for a better connection between sub assys.
View attachment 308997
Step 5 drill holes for ROCO side view mirrors, install grills & front bumper/winch assys. Assemble sub assemblies.
View attachment 308999
352s almost done-starting clean-up on 105s & gathering details for same.
View attachment 309000
PaulE