Right, back to the build.
After chewing over the thing, I decided six buildings would suffice and two bridges. I opted to make the buildings at this early stage so I could shuffle them around until I was happy with the overall balance.
Here's the first.
I scale draw them on a piece of paper, cut out the door openings and windows, then transfer the paper onto whatever the materiel is. (This is a polystyrene pizza base) Scribe around the openings and cut out with a sharp knife. I then scribe in any detail such as stone work and stick the sections together.
[ATTACH]305118[/ATTACH]
Using cheap 'poundshop' type acrylics, I slurry well watered down paint all over the building.
[ATTACH]305119[/ATTACH]
Then add colour.....
[ATTACH]305120[/ATTACH]
Ready for the timberwork.....
[ATTACH]305121[/ATTACH]
One shell done - Five more to go!
Cheers.
Ron
After chewing over the thing, I decided six buildings would suffice and two bridges. I opted to make the buildings at this early stage so I could shuffle them around until I was happy with the overall balance.
Here's the first.
I scale draw them on a piece of paper, cut out the door openings and windows, then transfer the paper onto whatever the materiel is. (This is a polystyrene pizza base) Scribe around the openings and cut out with a sharp knife. I then scribe in any detail such as stone work and stick the sections together.
[ATTACH]305118[/ATTACH]
Using cheap 'poundshop' type acrylics, I slurry well watered down paint all over the building.
[ATTACH]305119[/ATTACH]
Then add colour.....
[ATTACH]305120[/ATTACH]
Ready for the timberwork.....
[ATTACH]305121[/ATTACH]
One shell done - Five more to go!
Cheers.
Ron
Comment