[ATTACH]99331.IPB[/ATTACH]
I am now back to where i was with the new decks fitted and i have now started on the second layer of planking witch consits of vertical and horizontal templates and they also have where the port holes will be drilled out.
Peter t [ATTACH]99331.IPB[/ATTACH]
[ATTACH]100915[/ATTACH]
[ATTACH]99332.IPB[/ATTACH]
		
							
						
					I am now back to where i was with the new decks fitted and i have now started on the second layer of planking witch consits of vertical and horizontal templates and they also have where the port holes will be drilled out.
Peter t [ATTACH]99331.IPB[/ATTACH]
[ATTACH]100915[/ATTACH]
[ATTACH]99332.IPB[/ATTACH]


 
							
						 
	
 
							
						 i do have a oylmpic under way witch will be completed after this one
i do have a oylmpic under way witch will be completed after this one
							
						 
							
						
Comment