After an hour or so of stress-free assembly, this is the result. Just about ready for a prime, and basecoat of RLM 02.

One or two ejector pin marks, but I don't think they'll be visible when the fuselage is completed. There are several frames that fit in the bomb bay area & a large fuel tank etc. - none of which will be seen - but I think the frames will add strength to thie fuselage/wing joint, the bomb racks & fuel tank, I'll leave out.
There are decals for the instrument panel, but the detail is such that I probably will be better off painting - rather than getting decals to sit down over all those lumps & bumps.
Dave
One or two ejector pin marks, but I don't think they'll be visible when the fuselage is completed. There are several frames that fit in the bomb bay area & a large fuel tank etc. - none of which will be seen - but I think the frames will add strength to thie fuselage/wing joint, the bomb racks & fuel tank, I'll leave out.
There are decals for the instrument panel, but the detail is such that I probably will be better off painting - rather than getting decals to sit down over all those lumps & bumps.
Dave
Comment