HMS Hood Amati 1/200 Parts 33-34 Hull Sanding
Hello again well I had a good weekend the hull has been sanded smooth after applying approx 600 planks this took 12 issues and about 3 months of work at around 50 planks per issue can now move onto superstructure at last
See photos below hopefully showing how smooth the hull is now
I used the finger tip to detect blemishes raised planks etc and then sanded that area till it was smooth and level with next and so on until I had gone down one side and up the other so to speak the only area left is the bow where apparently the end pieces are not fitted yet which is strange as the stern ones were the 1st items applied before the planking began oh well suppose they know best










X
Hello again well I had a good weekend the hull has been sanded smooth after applying approx 600 planks this took 12 issues and about 3 months of work at around 50 planks per issue can now move onto superstructure at last
See photos below hopefully showing how smooth the hull is now
I used the finger tip to detect blemishes raised planks etc and then sanded that area till it was smooth and level with next and so on until I had gone down one side and up the other so to speak the only area left is the bow where apparently the end pieces are not fitted yet which is strange as the stern ones were the 1st items applied before the planking began oh well suppose they know best
Comment