HI Tony m8 your funnell is comin on brilliant work there as its a fairly easy shape to build from what i can see the hardest bit is the curved front but if curved front former are fitted then its just a simple matter of a wrap around usein very thin plasticard an gluein then cuttin to size like i did on my tiger funnels very good work there but what about the vetilation grills on the funnell back what are you goin to stick some vents on later ? an my tiger is comin on im now makin up the red an green nav lights which are now up to a point where i cant do anymore on them till they are fitted onto the main S/S but i cant fit them yet as they stick out an will get broken off if fitted now so they will go in the parts bag with all the others till needed an i will show pics of them on my tiger build soon an yes we get a little snow had about an inch of the stuff an jen threw a snowball at me an got me in the earhole but as she is nr ten yrs younger than me she can dash about an i could not hit her with my snowballs but we had a lot of fun lol but back in 1963 when i was a lot younger we built a full size igloo as then we had a lot of snowHi Chris, I have just built the outer skin of the funnel haven't worked on the top where most odf the detail is and yes working on the ship's bridge, my captain friend has sent me sent me the pics I asked him to take now can begin work on the interior .Here are two pics of my funnel turned out quite well.
Once the bridge is finished will get back to the stern section where a lot of the detail is , will have to scratch the rope winches , there is 5 all up and the anchor winch which is part of the rope winch , will continue work on the bridge tonight.
How isth Tiger going, take care heard you have had heavy snow, does it snow where you live. Tony
but lets see more of your bridge work please Tony cheers
chris












