Abit of a update when i come to do the upper level i will need to get into the corners of the layout so on one side i will have a removeable 2ft square board that will have a small village on it,but the otherside i was just going to crawl under the layout to get to the back of it but i thought wait a minute i have a 2ft square piece of baseboard on the lower level that hasn't got a thing on it.
So i will cut that 2ft Square section out so i can get to the back of the layout to work on the upper level but the steam engine sheds sit over that bit on the upper level,so i will make that section removeable so i can get to the back of the layout to work on it and then replace it to operate the layout.
Heres a picture showing what section of baseboard i will be removing but the pic is of the board before the rest of the baseboards were fitted.
http://img.photobucket.com/albums/v284/dynamite25/Cutout.jpg
So i will cut that 2ft Square section out so i can get to the back of the layout to work on the upper level but the steam engine sheds sit over that bit on the upper level,so i will make that section removeable so i can get to the back of the layout to work on it and then replace it to operate the layout.
Heres a picture showing what section of baseboard i will be removing but the pic is of the board before the rest of the baseboards were fitted.
http://img.photobucket.com/albums/v284/dynamite25/Cutout.jpg