Here's an update all the portholes have been drilled out and A&B deck sides have been fitted just the final sanding to go before paintingView attachment 284068 View attachment 284069 View attachment 284070
Just a little over four feetGreat work Peter, she must be huge.
The sides are all plank on frame and the crane bases are wood with a card wrap aroundLooking good. I've always wondered is the sides of the superstructure and crane bases cardboard?
the dreaded planking hats off pete look fabThat's all the sanding done and I have finished off the temporary second layer of planking witch contains the portholes its in place and once I have done the other side it will be permitleyView attachment 283637 View attachment 283638 View attachment 283639 View attachment 283640 View attachment 283641 fixed and portholes drilled.
scalemodelling.co.uk is a privately operated online discussion forum. All content posted by members reflects their own views and opinions and does not necessarily represent those of the forum owners or administrators. While reasonable efforts are made to moderate content, no responsibility is accepted for user-generated material. By using this site, you agree to comply with UK law and the forum rules.