Absolutely Scottie.
you could increase production and cut down the whole process but you are governed by the curing time in order to release the mould and cast another. I have eight brick wall panels and can't go any faster otherwise you start to try and release the cast to early and break the mould.
However ..... for the purposes of this first wall build, I think I have enough with some to spare and allow for breakages along the way. Any left over will do the second wall build.
work surface all cleared up and ready to go again ....
enough full wall section casts .... a couple broken but won't be seen behind the card " stucco " layer.
plenty specials and Slim Jim's as I have the knack of casting and releasing these now with a far higher success rate. It's all in the way ( and order ) in which you release each side of the mould.
I have went from a ..... say 15% success rate ..... to a 75% success rate and getting better. If you get the water / plaster mix slightly wrong ..... you also pay for it dearly. I have adjusted the ratio from nearly 50 : 50 to closer to 65 : 35 plaster to water. Huge difference.
So Next up ...... start constructing my first wall for actual use on the diorama. I have plenty of lintels cat for the coping stone but have been debating whether or not I should have used the actual " coping stone " mould which is more decorative but smaller in length ..... so you would need a significantly increased mould production.
The lintels look ok for now.
I have plenty " Daler " board for the " Stucco " layer so no woriies there. The copings don't need to be added until the rest of the wall in constructed so if I change my mind ..... Lintel versus coping stones, it won't hold the main build up.
Very very slow progressed due to working away and " mumsie duties " but hey ...... there is no rush ..... is there ??????
The ongoing tasks are numerous but I am looking forward to giving them all a bash ...... Stone wall in " Blue foam " around the Cafe area being the next.
Once I get these walls done and get a better feel for the way the walls / perimeters are going to fall in with the buildings ..... I can finally decide on the buildings exact location in relation to everything else. I can start thinking about fitting the buildings out ..... floors, ceilings and roofs etc. Groundworks etc will be last. Vehicles / artilliary etc have been started but are a distant thought right now...... then the explosion zone and electrics ....... seems never ending but the mojo is as strong as ever ..... it's all down to time at the moment .....
Hope you are still onboard with me despite the slow progress.
cheers for now
toto