Theme editor

Scale Model Shop

Richard's Layout.

  • Thread starter Thread starter Guest
  • Start date Start date
Status
Not open for further replies.
Thread owner
Hi all!


I’ve been working on the electrical installation. All the cables are welded on the tracks, and those ones are connected to the main sheet metal.


The yellow and the blue cables are the ( - and the + on the rails).... The blacks are the turnouts ones. Now I need to connect the brown ones at the switches. And then, of course, remains the house’s lights :)


View attachment 241117



All this work is interesting.....but I’m wishing to start with the decoration and the weathering :D
 
DCC is so much simpler to wire, just two wires for the rails. I had to fight the urge to start the scenery before completing the wiring. Lay the the track, wire it, test it, ballast it, test it, scenery, test it.
 
Thread owner
Good morning!


I’ve been working on the track.....and after some issues it finally WORKS!!!! Just need to sand and clean a little part under a tunnel....but all the track works fine :)


Anyway remains to connect all the turnouts on the switches.....let’s see what will happen there :confused:


I repainted all the pieces of the last buildings.....if I have time, I will try to glued and build they this afternoon!


I built and glued the village zone as well ;)


View attachment 241284



Thanks for looking


Polux
 
Thread owner
\ said:
Are you going to paint and weather the track and sleepers? It makes a massive difference to the look of a layout.
View attachment 140787
Of course!!! :D


Will be after all the electrical installation works perfectly.


Paint it, ballast it and weathering it... :)
 
Coming along nicely Polux. Nice layout and buildings.


I really would love to get me one of these. It's all the wiring and tech. stuff that puts me off thought.....
 
Thread owner
Hi all!!


Perfect....I have good news!!! :)


After a pre-test, all the seven turnouts work perfectly. :D


The black button leaves the turnout on the normal position. The red ones active the turnout....


Now is time to finish the electrical installation on the layout and start to build the village and all the different items, and then....the weathering :rolleyes:


View attachment 241407



Thanks


Polux
 
Thread owner
Very well done with nice neat wiring. It is a great feeling when everything works.


For anybody not wanting to start a layout because of the electrical side of the hobby go for Marklin C track as I think has been said above. Turnouts etc don't need wiring and work with decoders.


As model rail is my main hobby I am enjoying this thread and the excellent work being done on the layout.
 
Thread owner
Thank you very much David and all you for the nice comments and help :)
 
Thread owner
It's all looking amazing (the wiring is looking very complex )
 
oh wow great additions to the layout Polux,will look great once on,


real liking this one, ;)
 
Thread owner
Really nice kits. Although some have been around for while they will go together well and of course minimum painting.


Enjoy the build.
 
Thread owner
Hi all!


For me, the Christmas day, means a relax and calmly day... :)


So I’ve been working all the day on the layout.


I designed new wood battens to add the entire electrical stuff hide under the mountain. Wasn’t an easy work....but now I having all together and all they works, as well, with a single plug.


View attachment 241753



There is space enough to manipulate all the tools and solve some occasionally accident with the trains :)


View attachment 241754



This is a general look of the finished electrical installation.


There is an amount of wiring ;) now just remains the houses lights....


View attachment 241756
 
Status
Not open for further replies.
Back
Top