Long overdue update,
As you may have read above there were parts missing and I was waiting for them to arrive, and in the meantime I got on with other builds and this one got shelved.
So, taking another look at it on last week I set to and demolished it (not litteraly)... I looked at the build and realised that I had in fact jumped the gun, I had failed to add the inner plates for the front track guards but added the launch frame, consequently I could not get the side plates fitted. Plus I was not happy with the centre turret cover. The parts from HK arrived at last (thankyou Russell), and that was the incentive to get going again.
As I said on the 'Doher' build, I have taken a break to sort out the builds that have been started never to be completed... And in my sorting out I came across another Churchill kit for the carpet layer (never to be built), so I looked at one and then looked at the other, looked at what required correcting and set to work... and this is where we are today - started a week ago....

So as you can see the main hull has been completed except for the hatches, a new turret plate has been fitted, a new 'foot' for the launch frame and a new support frame for the hydraulic piston tank.

The rear frame and toolbox are in place, the moulded edge plates that in real life fixed the mudguard to the hull have been removed so that the verticle frames could be fitted.

This is the piston rod assembly and in the center aer the guides that were missing from the kit and caused the delay. If you look at the hull a lot of the side frames/fittings are missing, this is because they were not required on this version - and yes, I was tempted to do the version with the round crew entry/escape hatches...

The launch arm has been assembled and the piston rod/cylander are now in place with the front bridge support frames.
Ah! I can here you say - how do the crew get in and out if the slide frames are stopping the hatches opening fully - they used the sponson escape hatches....
Now for the bridge itself.
Mike