


Hi Paul,E coming along well double deck be continuous run , my last permanent layout was like that , on two levels , love your back scene, did you paint it , I will have one back scene on my layout to cover track . TonyStill sorting out south end but finished laying out mine module & nailing down south inner grade loop violating grade std a bit to get under yard grade. Full stop. Have run out of rail connectors. Poor planning on my part. Thought I had stashed more. I should have used more "flex track" but instead used individual Atlas pieces for speed. So now have used up most of the Atlas tracks but have run out of connectors & have lots of flex-track left over. Duh.
You can see continuous run on far right holding to grade std. & the layout of yard & run-around connector before elevating it. In midframe is a pile of lumber to go to the chopsaw for elevating the yard/run-around connector.
north yard connector layout.
C&Cs encouraged. PaulE
scalemodelling.co.uk is a privately operated online discussion forum. All content posted by members reflects their own views and opinions and does not necessarily represent those of the forum owners or administrators. While reasonable efforts are made to moderate content, no responsibility is accepted for user-generated material. By using this site, you agree to comply with UK law and the forum rules.