So ....
The mancave is under lock and key. Thinking on too tomorrow.
Was going to do a primer coat to the subroad surface but decided notto bother. Once these cobbles are down, nobody is gong to see anything. N9t just that. It would cover my cobble laying reference points.
I decided to vspend a little more time with the plaster casting in order to get say .... 4 sets of manhole covers and frames cast.
I originally envisaged 3 sets but the creator from the explosion has done away with one of them ..... right in the middle of the T junction. That leaves two and one spare.
Once I get the " wet " stuff away, I will start cobbling. Its going to be a time consuming exercise but believe it or not..... once you get started, its amazing the coverage that you can achieve.
I will of course need to cut out the hole for the explosion on the Tee junction ( not that hard really ) and dig down into the foam to create the crator. I only have 40mm of foam depth which at 9mm per foot ( scale ) only gives me 4 and a half foot of depth. It will have to do.
I need to look at the footprint of the buildings and decide whether or not they need raised to meet pavement level ( to be decided ). Then start gluing the buildings together akigng any last minute adjustments to final positioning.
Then ...... from a life of plaster .... to a life of balsa wood and a proxxon table saw to get started on kitting the buildings out with floors ceilings ad roofs ........ or parts thereof.
So .... I have given you a bit of an insight into my head and planning thoughts for now. The running order could of course change ( without notice ) but I will try and stick to it as jmuch as possible to make the thread as followable as possible .....
Time to go and see what everone else has been up to now.
Cheers
Toto