Absolutely ..... loads of scatter materials. I'll look at that once certain elements are nearer completion. Same with one of the other big exercises that I will have with balsa wood ..... broken roof members, floor boards, windows ..... it goes on and on. I won't be finished this anytime soon.
So .... hit the mancave earlier and have even impressed myself with my progress and still feel like there is still some fuel left in the tank for more .....
finished this section all bar the various cuttings that will need to be done .... I'm not slowing down to do these just now. Obviously still have to grout , paint, weather etc .
and an ariel shot ..... whatcha think ??????
I'm moving onto this section next .....
which falls at the other side of the explosion ...... and then this .....
The last bay on the side I've just been working on ..... why the jumping about ....... Purely psychological on my behalf. Either way , I am closing in towards the the explosion zone, leaving the longest stretch of cobble laying until last.
Once I get to the point of working around the explosion hole, things should hopefully start to get interesting again. I will still be using the Simca 5 as a welcome distraction from cobbling when I feel I need it. next to phase in will be the permanent gluing of the three buildings and then the balsa wood production saw mill shall kick in to start flooring and roof construction amongst other timber elements.
bare with me ..... hopefully you should find it interesting as we progress.
now ..... back to cobbling ..... cheers for now
toto