Tracks are now done, so on with more interesting stuff….
For those that are curious, they were link and length and this is how I do them….
First up, cut some suitable
Tamiya tape so the links can be put on them as indicated in the instructions. I used 10mm tape for these. Then fit the wheels to the chassis using blue tack to keep them in place. After this, add the links in the order required….
In the picture above all the wheels are still removable so they can be painted separately. The remaining links on the right were then added to give the final length required, looking like this when they are on the tape….the couple at the top are individual….the bottom is a short length.
The taped links were then wound around the wheels to check the length. I forgot to take the picture for this
Once tested, the track is removed, laid flat again, and joins between the links are glued using Tamiya’s extra thin (TET) letting it flow between the pieces.
After this, and before the glue hardens completely, the track is wrapped back around the wheels, taped in place, and the final link glued using TET.

The missing dry run picture would actually look exactly like this….. any slight misalignment can be corrected at this stage because the glue is still soft….
Leave the tracks to harden completely. I usually leave them overnight to be sure.
You should then be able to remove the complete track run and take the tape off so painting becomes much easier….
The black line on the top helped the lining up when assembling the tracks. The top idler has a locating pin on it, so this is where it fits.
This approach also works for individual link tracks, but obviously takes longer because there will be more parts.
Time taken on this was about two hours, of which one and a half hours was spent slowly cleaning up each link. Most of this time was needed to deal with the inevitable ejection pin scars from the moulding process. Anyway, body next so it should get interesting again…..