Up date from the Bunker at Race Towers.
Hi all.
This afternoon saw the labeling of the cut sections, and an email to the lighting supplier.
All having to be marked from the back as most of the labels would get covered.
Starting with the floor I marked out the upright sections so I can leave room for the walls.

Lines can be seen on the board behind the cutter.

First 7 rows done, remembering to dismiss any curved sections.
While the floor was setting I turned to the bunker ceiling.

The front face had a section of rebated Balsa pined and glued to it.
Further back is the x beam where the internal divider will be In between these two will be the ceiling timbers again using strips.
More x beams will then be glued to the ceiling at the correct distances. These x beams will hide the lights.

Front edge..
Thanks for following. Comments etc welcome.:smiling3:
Dzhon.