G
Guest
Guest
Impressive house you’re building there
Only thing is, I would set that door on the side into the wall rather than being on top of it. It would let in rain this way 





Thanks for the feedback and I think that I have been able to follow some of your recommendations guys. I’ve filled the mortar joints..well at least most of them and have left a few open for decay / neglect etc over the years, the flashings and coping at the roof ridge have been added and I’ve added a small door at the base of the chimney to clean out the soot, ashes, etc. the door canopy is being added to provide a cover for those who will be entering the cafe.


Good evening everyone and thank you for continuing to follow along. I was able to do some additional painting, including gutters and downspouts. However, they are not yet installed. I was able to add the patina of the copper flashing at the roof. Chimney stacks and doors, shutters and siding. Still a lot of progress to do in the building, including electrical systems, and some other washes and light weathering/highlighting. Thanks for your support so far and I will continue on. have an enjoyable evening everyonescalemodelling.co.uk is a privately operated online discussion forum. All content posted by members reflects their own views and opinions and does not necessarily represent those of the forum owners or administrators. While reasonable efforts are made to moderate content, no responsibility is accepted for user-generated material. By using this site, you agree to comply with UK law and the forum rules.