In September 1983, NX611 was finally purchased by Fred and Harold and, four years later, after completing an agreed total of ten years gate guardian at RAF Scampton, she was brought to East Kirkby, courtesy of the RAF. It was sixteen years since Fred had seen her at Blackpool auction.
The first moves towards restoring one of her four engines were made in 1993. Two ex RAF engineers were brought in to do the job. They began work on No3 engine. Although it had been idle for 22 years, they were confident they could bring it back to life. Accessing the spare parts was organised, the engine rotated to ensure it would still turn and the cam shaft covers removed. Both had to be replaced, although the engine cylinders were in good working order. Then the propeller was removed, stripped down and examined and - apart from having to adjust the blade settings - everything proved to be in fine order and was rebuilt.
Local contractors were brought in to check the wiring and make good where necessary. That alone was a ten-day job.
The engine's starter motor, magnetos, fuel booster pump and ignition harness were removed and checked, the fuel tank was pressurised and the fuel jettison system reset. When the throttle controls between the cockpit lever and the engine were uncovered, it was discovered that almost a third of the small control rods had to be replaced.
However after about seven hundred man hours and at a cost of �£7000 the engine was finally ready.
This work was then completed for all four engines and they now at a fully operational taxiing standard.