Thanks Ron, and welcome back, hope you had a great holiday.
Finished drilling out the Hull port holes and fitting the Deck. The first photo shows the lack of definition of the port holes and the second shows the improvement. Note the third photo of the Scharnhorst's anchor way, comparing it to the previous photo it is much more rounded so some cosmetic surgery is necessary.
[ATTACH]120674.IPB[/ATTACH]
[ATTACH]120676.IPB[/ATTACH]
The deck was a good fit, the slots previously mentioned in the diaphragms helped with the fit. There is a gap between the two deck sections, I checked the deck housing fit beforehand and there is no problem with this gap. I will sand down some 1x2mm Evergreen strip and fill it in.
[ATTACH]120672.IPB[/ATTACH]
Cheers Derek
[ATTACH]120673.IPB[/ATTACH]
[ATTACH]120675.IPB[/ATTACH]
Finished drilling out the Hull port holes and fitting the Deck. The first photo shows the lack of definition of the port holes and the second shows the improvement. Note the third photo of the Scharnhorst's anchor way, comparing it to the previous photo it is much more rounded so some cosmetic surgery is necessary.
[ATTACH]120674.IPB[/ATTACH]
[ATTACH]120676.IPB[/ATTACH]
The deck was a good fit, the slots previously mentioned in the diaphragms helped with the fit. There is a gap between the two deck sections, I checked the deck housing fit beforehand and there is no problem with this gap. I will sand down some 1x2mm Evergreen strip and fill it in.
[ATTACH]120672.IPB[/ATTACH]
Cheers Derek
[ATTACH]120673.IPB[/ATTACH]
[ATTACH]120675.IPB[/ATTACH]
Comment