OK .....
back from dounreay ..... 8 hour drive today as an accident shut the A9 down just before Perth. ..... Sat for two hours then eventually diverted through Dunkeld .... must have been a bad one .... hope everyone involved is ok.
Anyway ..... back in the saddle and ...... a change of plan ..... Ooooooo.
My intention was to carry on from where I left off last week ......
and start the roof tiles now that I have removed the pins from the tile battons.
but ..... then I got to thinking. When I do the painting etc and the remaining wood work both internal and external, the building is going to be subjected to a load of handling and the tiles could take the brunt of it ..... So decided to postpone the tile installation for now.
My next project is to bring this other building up to the same stage .....
two roof sections and one internal upper floor......
and the other end .....
and the rear .....
This has been a small manufacturing shop ( maybe a joiners ) with a storage area and maybe a small office upstairs.
So that is the plan for now with the third building .... the Cafe .... I think, coming after this one.
So now I need to look at ripping up more roof joists and floor joists etc ..... and work out how to build it.
maybe more later.
toto