Theme editor

Scale Model Shop

Pushing Back .......

Thread owner
Apologies ...... this will be it for now .... couldn't forget the wash ....

P1020273.webp

there we go ..... ready for tiling now ....

cheers

toto
 
Thread owner
Thanks Joe,

Still got the hardest part to come ..... painting the brickwork. Don't have a clue how i'm going to do it and maintain the mortar courses ..... this is where it could all go horribly wrong. If I make a mess of that ....... then the bin beckons ....... 😂 we'll see ..... I'll need to bite the bullet and take the plunge at some point.

Cheers

Toto
 
Thread owner
Done a bit more research ..... read that as utube gazing ...... looks like drybrushing the brickwork but still airbrushing the inside walls and mayby the ceilings as well.

On mumsie duties this afternoon so I may only get an hour oor two in the mancave tonight. I will be starting the roof tiles.

I only made a few casts of the tiles yesterday so we'll see if I have enough to co plete the task ....... probably not. I was getting a bit weiry of casting as I only have the 3 moulds and by the time you take the drying time and general turn around of the complete cycle process .....I'd had enough.

Meanwhle before doing my domestic duties for the day ..... its a coffee and more utube videos,

Tara for now

Toto
 
Thread owner
OK .....

back from dounreay ..... 8 hour drive today as an accident shut the A9 down just before Perth. ..... Sat for two hours then eventually diverted through Dunkeld .... must have been a bad one .... hope everyone involved is ok.

Anyway ..... back in the saddle and ...... a change of plan ..... Ooooooo.

My intention was to carry on from where I left off last week ......

P1020274.webp

and start the roof tiles now that I have removed the pins from the tile battons.

P1020275.webp

but ..... then I got to thinking. When I do the painting etc and the remaining wood work both internal and external, the building is going to be subjected to a load of handling and the tiles could take the brunt of it ..... So decided to postpone the tile installation for now.

My next project is to bring this other building up to the same stage .....

P1020276.webp

two roof sections and one internal upper floor......

P1020277.webp

and the other end .....

P1020278.webp

and the rear .....

P1020279.webp

This has been a small manufacturing shop ( maybe a joiners ) with a storage area and maybe a small office upstairs.

So that is the plan for now with the third building .... the Cafe .... I think, coming after this one.

So now I need to look at ripping up more roof joists and floor joists etc ..... and work out how to build it.

maybe more later.

toto
 
Thread owner
OK ...... so on we go .....

I've been looking at the way the gable walls meet the roof eaves ..... and its not good. I think there has been a bit of an error with the cast but I may be wrong. I'll come back to that later ..... but meanwhile I have cut the Daler Board for the lining of the inside walls .....

P1020280.webp

and here is the first cut .... albeit upside down ..... 😂

P1020281.webp

and there it is in place awaiting the PVA .... but first the two side walls ....

P1020282.webp

I offered the piece of Daler board up against the wall and then marked around the edges ....

P1020284.webp

and there we have it ..... simples ....

P1020285.webp

and the same with the other side. I'm not sure if I will do the same with the single storey store house or not ..... the jury is still out on that one.

I want to get the windows lined out and the roof and first floor to the office done first and then move on to the single story building which should be easier.

I'll come back with the difficulties I am having with the roof ridges later. I still have to get my head around that but there are a couple of issues which I need to overcome.

cheers for now

Toto.
 

Attachments

  • P1020283.webp
    P1020283.webp
    398.1 KB · Views: 1
Thread owner
OK ...... topped up my red wine ..... I can continue ..... erm ..... I think.

I spoke about issues with the roof construction ..... here is what I have ..... I will apologies if the photo's don't quite explain themselves ..... the wine is taking effect ....

P1020286.webp

here is the first issue ...... a line of coping stones which to my opinion are both too high and too wide .....

P1020287.webp

a view from underneath showing the brick corbel ....

P1020288.webp

one of the gable walls which finishes in line with the coping .....

P1020289.webp

and one which finishes slightly below the coping stone. ..... Now .... some might argue that the builder / assembler got it wrong. You might be correct. at the point where I glued these parts together, I noticed that these parts were out a bit. I had to make the choice whether to make the base level or whether to line up the roof edges ....... As a total twat ..... I went with the base.

Now I will need to do a bit of skullduggery to pull the roof back in line.

Not only that but the tiled roof edge at the eaves is just going to be wrong. you would not have a tiled roof running down on to a capping stone the way that this is going to do. So I need to come up with a solution ...... which I don't have right now in order to make the finish believable.

I need time ..... without the wine.

so its on to tomorrow.

cheers for now

toto
 
Thread owner
Daler board glued to the internal walls this afternoon. Only had about 45 minutes in the shed todsy and I'm out for a beer tonight.

I think I may have a solution ( read that as fudge ) for the roof woodwork. Thats for tomorrow so it'll be balsa wood ripped to correct width and some PVA.

Looking forward to tomorrow.

See you then

Toto
 
Thread owner
OK ...... back to it then,

My Daler Board has dried over night .....

P1020290.webp

and ....

P1020291.webp

I will need to scribe the brick courses round on to the inside of the room where the plaster ( Daler Board ) finishes. Thats for later as for now ......

P1020292.webp

I'm making a start on the roof timbers and will probably line the inside of the window openings at the same time ..... just as the first building I done earlier ....

I am very much constructing the roof ..... on the hoof so if it does not resemble any construction technique that you are aware of ..... artistic licence my freinds. Covers a multitude of sins.

Where to look out for is where the roof slates meet the wall coping at the top above the windows .... completely at a loss here .... never mind .... that will be the last thing on the minds of the occupants right now. 😂

more later as it happens

toto
 
Thread owner
OK ....

A little more done .... You can only take small steps until the main support frame for the roof timbers is built and dry . after that you'll see some quicker progress.


P1020294.webp

coming along .... slowly ...

P1020295.webp

and .....

P1020296.webp

hope you can see where we are going with this ....

until later

toto
 
Thread owner
So ..... the roof trusses ....

P1020297.webp

and it's all about spacer then a truss .... spacer then a truss .... you get the picture .....

P1020298.webp

a bit like the above .....

P1020299.webp

and we get to the end ..... with an uneven space that I could have avoided with a little more care but ..... I can live with it.

P1020300.webp

the ridge line at the top is starting to bulge a little but this wont be seen as once the noggings are in and the roof has a bit more structural strength ..... I will be cutting the ridge line back a bit so it will be gone....

P1020301.webp

and from the underside from the rear .....

and now to go and do the noggings.

cheers for now .....

toto
 
Thread owner
So ..... noggings it is then ....

P1020302.webp

and as you can see the rafters are starting to run off at the top .... never mind, once I cut them back a bit , it wont be quite so noticeable....

P1020303.webp

starting to get somewhere ...

P1020304.webp

squint or wot ....

P1020305.webp

and from the underside ....

I'll need to give that little lot time to dry before doing any more or it will just take a hammering ....

so long for now

toto
 

Attachments

  • P1020303.webp
    P1020303.webp
    616.7 KB · Views: 0
Thread owner
OK ..... so whilst awaiting the roof to dry out a bit ..... I've started on the ground floor .... well away from the roof .... 😂

So on we go ....

P1020306.webp

and I start with the perimter framework ...

P1020307.webp

a bit like this ...

P1020308.webp
and cut a few floor joists to let me get started ....

P1020309.webp

Now I'm on nogging cutting duties .... never stops does it ....

back later

toto
 
Thread owner
OK .... picking up from where I left off ....

P1020314.webp

The first few floor joists and spacers start to go in. ..... need to watch that I don't glue the whole thing to the base .....

P1020315.webp

progressing nicely ....

P1020317.webp

job done and I have lifted the whole structure off the base ..... its supported with wooden dowells that I drilled in way back at the start when I glued the walls together.

P1020316.webp

there we go ..... on stilts ....

Now to give it all a chance to dry a bit.

maybe back later .... I have a case to pack for tomorrow.

cheers for now

toto
 
Thread owner
So .... thats me until next weekend. The last weekend before jetting out to Cyprus on the 15th.

I want to have this buildings ground and first floor before I go and also the roof tile batons on as well...... thats the target untilI get back and have a fresh start with building no 3.

So, inching forward a bit at a time. I think after I get building no 3 up to the same level as the other two buildings, it will either be dry brushing the brickwork on all three building, or giving the inside walls a coat of filler at the joints and painting the insides.

Also start priming the pavibg areas with a brown primer before laying the pavement slabs. I suppose what I'm trying to say is that we shall get away from balsa wood for a bit of a break. ..... it'll be some painting and filling time.

Lets wait and see.

Cheers

Toto
 
Back
Top