Theme editor

Scale Model Shop

M-18 for Simon.

Thread owner
Update,
Been busy doing other things of late, and the break away has allowed me to re-focus on this build.
Have started work on the front lower hull where the dozer blade attaches (pic later) and the dozer blade itself.
20201126_222405.jpg
This is the carcass of the blade, the cross pieces are there to support the curved part of the blade itself and not for alighnment or strength.
20201126_222418.jpg
This is the rear under the early stages of construction...
20201126_222505.jpg
... and here is the ally sheet ready to be added...
Cheers, Mike.
 
Thread owner
Update more....
Here is the blade in place....
20201127_154528.jpg
...still more detail work to be done...
20201127_154433.jpg
..... The 'armoured' covers for the rams came from copper sheet and cut from a template....
20201127_154416.jpg
... this pic show the half template on the left, and the full one which was used to mark out the copper....
20201127_154537.jpg
... and this shows one of the rams for the 'dozer blade. More later.
Mike.
 
fantastic work going on there Mike...that stowage box is top notch :thumb2:
 
Thread owner
Update,
Bit more work done on the rear end.
20210119_210056.jpg
20210119_210106.jpg
20210119_210114.jpg
20210119_210126.jpg
And that's it 'till next time.
 
Hello mate,
I wondered where you had got to. That is some dam fine scratchery mate. Hope all is well with you.
 
Thread owner
Hello mate,
I wondered where you had got to. That is some dam fine scratchery mate. Hope all is well with you.
Hello Scottie,
Just been prowling around the work room doing a bit here and there. All is well here, hope the same for you.
Cheers, Mike.
 
Hi Mike
A happy new year to you and yours - lets face it it has got to be better than the one just gone by.
As for your modelling - just so skilled. Really impressive scratch building. It all looks very neat and sorted.
Jim
 
Wow! is what this is Mike. Been busy for the last month I see and the results are incredible.

Cheers,
Richard
 
Thread owner
Update,
A bit more work done on the stowage bins and the jerrycan rack, plus the box for the support beams and crow bar.
20210129_161929.jpg
20210129_162108.jpg
20210129_162052.jpg
20210129_162148.jpg
20210129_161911.jpg
That's it for now, time for a break, so back onto the M113.
Mike.
 
Back
Top